Pipelines Maviz proposes and you approve.
Six steps from the tables to a scheduled pipeline: Tables, Data Definition, Quality, Silver, Gold, Publish. Maviz proposes at each one, you decide, and nothing runs on the platform before Publish. On Fabric and BigQuery today, with SQL Server, a Data Engineering studio and migrations beside them.
Six steps from tables to a scheduled pipeline. You decide at each one.
Quality checks run in your warehouse and return counts. A failed check is a Blocker, a Warning or Info, and every one takes a decision before Silver is planned. Nothing runs on the platform before Publish.
- Blocker
ordersorder_id unique2,406 rows - Warning
order_linesorder_id matches orders308 rows - Warning
customersemail not blank1,559 rows - Info
ordersrows in the last 30 days12,880 rows
Everything, feature by feature.
What is live is live. What is still being finished carries an Early access tag.
The six-step journey
- Tables
Pick the tables; related tables are a click away.
- Data Definition
AI descriptions marked as AI; what it could not settle becomes a question with button answers; keys, nullable columns, history and PII as stored facts; versions and a diff of every describe.
- Quality
Completeness, uniqueness, validity and reference checks run in the warehouse as counts. Blocker, Warning or Info; a 0-100 score; Fix, Accept or Ignore on every failure; add your own checks.
- Silver
A cleaned copy per table, every rule traced to a quality decision or a detected trim or cast. Plan only - nothing runs yet.
- Gold
A star schema with current-value dimensions, a date spine, serving tables where the volume warrants them, validation rules and a sign-off. Source tables are never written.
- Publish and run
One pipeline; a schedule, an upstream change or a manual run; a full first load, or a validation window first; the Gold sign-off arms the trigger.
- The pre-run gate
A run holds when the source changed shape or a quality check got worse, and emails the engineer.
- Pipelines page
The run flow step by step, a red flag on the failed step, history, pause, resume, run now, and a banner when the worker stops.
Platforms
- Microsoft FabricEarly access
Lakehouse Silver and Gold, two notebooks and one Data Pipeline per project, Direct Lake to Power BI.
- BigQuery
The same six steps with a step chat, Gold replayed from the stored design, Looker at the end.
- SQL ServerEarly access
Templates only, no model call: quality, Silver and Gold as stored procedures you deploy; Tune (slow queries with a fix script), Ops (incidents with cause and fix), Objects (describe a view or procedure; Maviz writes, reviews and tests it in a rolled-back transaction) and data-free Excel report packs.
- One list, the connection decidesEarly access
Every project in one place; the connection you pick chooses the journey.
The Data Engineering studio
- Connect and scope as a conversationEarly access
Source, target and the journey - Prepare, Model, Deliver or End-to-end - chosen in a chat that does what you type.
- Rules Maviz writes, and asks aboutEarly access
Per activity, with the questions it needs answered instead of guesses; reviewed, then locked.
- Deploy to FabricEarly access
Notebooks and SQL generated, the pipeline created and published, the run watched with progress and a plain recovery path.
- Every run makes a datasetEarly access
The output of any project appears on the Datasets page, named by you.
Migration and documentation
- SQL Server to FabricEarly access
Warehouse or Lakehouse: source review, mapping and transforms designed by chat, row rules with reject accounting, approval before anything moves.
- Attach a Word specEarly access
The migration assistant reads a document and proposes from it; you apply.
- Documentation projectsEarly access
Document a source with Maviz and finalise it into the Data Catalog.
What it looks like.




Four steps.
- 01
Pick the tables
From a connection; related tables are suggested.
- 02
Review definitions and quality
Answer the questions, decide every failed check.
- 03
Approve Silver and Gold
Plans, not runs. Confirm each table.
- 04
Publish
The first full load, the sign-off, the schedule.
See a pipeline built on your own schema.
Book a demo and we walk the six steps on a schema you choose.